Peshawar – Karachi Motorway (PKM) Sukkur – Multan (Section 4 of Bridge)
(2018)
Piling Work
IVCC installed 461 Piles of 1,200mm diameter with maximum depth of 50 meter. Total drilling footage for this project was 15,008 meters. 7 Pile Load Tests upto maximum 700 Tons each and 171 PIT Tests were carried out. Pile Load Test Reports were also submitted. A total of 16,970 Cubic Meters of concrete and 2,716 Tons of Rebar Steel were used.
Client: National Highway Authority (NHA) Pakistan/China State Construction Engineering Corporation Limited (CSCEC), Pakistan Branch