Skip to content
ISO 9001:2015 CERTIFIED
IVCC Engineering | The Best Engineering Company in Pakistan Logo

60+ Years of State of the Art Engineering

  • HOME
  • ABOUT
    • Our Founder
    • IVCC Background
    • IVCC Key Personnel
    • Local and International Partners
  • PROJECTS
    • Master List of Completed Works
    • Recent Projects
    • CPEC Projects
  • SERVICES
  • DOWNLOADS
  • MEDIA
  • Contact Us
  • HOME
  • ABOUT
    • Our Founder
    • IVCC Background
    • IVCC Key Personnel
    • Local and International Partners
  • PROJECTS
    • Master List of Completed Works
    • Recent Projects
    • CPEC Projects
  • SERVICES
  • DOWNLOADS
  • MEDIA
  • Contact Us

Media Gallery old

Media Gallery oldadmin2018-11-30T10:40:08-05:00
Steel reinforcement cage for 2 meter diameter piles for bridge over River Jehlum at Bhera, Lahore-Islamabad Motorway
Kalaam Bridge, Northern Areas, Pakistan
Asphalt Plant, Kalaam Bridge, Northern Areas, Pakistan
Steel reinforcement cage for 2 meter diameter piles for bridge over River Jehlum at Bhera, Lahore-Islamabad Motorway
Concrete demolition using the BROKK 250 at Daldara Weir, Tarbela Dam 2
Dohuk Dam
Pile testing
Bridge construction
Piling using Hydraulic Rotary Machines for Slope Protection Works at Jhika Gali, Murree 8
Piling using Hydraulic Rotary Machines for Slope Protection Works at Jhika Gali, Murree
Piling using Hydraulic Rotary Machines for Slope Protection Works at Jhika Gali, Murree
Piling using Hydraulic Rotary Machines for Slope Protection Works at Jhika Gali, Murree
Piling using Hydraulic Rotary Machines for Slope Protection Works at Jhika Gali, Murree
Piling using Hydraulic Rotary Machines for Slope Protection Works at Jhika Gali, Murree
Piling using Hydraulic Rotary Machines for Slope Protection Works at Jhika Gali, Murree
Piling using Hydraulic Rotary Machines for Slope Protection Works at Jhika Gali, Murree
Drilling with reverse circulation rotary machine of 2 meter and 2.2 meter diameter pile upto 60 meter depth. Bridge over River Jehlum at Bhera, Lahore-Islamabad Motorway
Lowering of Steel reinforcement cage for 2 meter diameter piles using couplers and crimping machines for bridge over River Jehlum at Bhera, Lahore-Islamabad Motorway
Lowering of steel reinforcement cage for 2 meter diameter piles for bridge over River Jehlum at Bhera, Lahore-Islamabad Motorway
Placement of pre-fabricated girders at Bridge near Chashma Barrage
Completed sub-structure of bridge over River Jehlum at Bhera, Lahore-Islamabad Motorway
Piling using Hydraulic Rotary Machines for Slope Protection Works at Jhika Gali, Murree 8
Concrete demolition using the BROKK 250 at Daldara Weir, Tarbela Dam
Geotechnical Investigation Works in Tarbela Dam Lake
Grouting Station at Daldara Weir, Tarbela Dam
Construction of beams and caps for 500 KvA Transmission Line Tower in River Indus at Ghazi Ghat 2
Construction of beams and caps for 500 KvA Transmission Line Tower in River Indus at Ghazi Ghat
Piling Works for 500 KvA Transmission Line Tower in River Indus at Ghazi Ghat
Pile Retaining Walls Faqir Plaza Lahore
Dohuk Dam
Exploratory Drilling Dohuk Dam
Dohuk Dam
Dewatering at Chashma Barrage The biggest dewatering project in the world
Brokke Concrete Demolition at Tarbela Powerhouse Extension
Installation of permanent steel liners with vibro hammer at Chakri Bridge, Lahore-Islamabad Motorway
Installation of permanent steel liners with vibro hammer at Chakri Bridge, Lahore-Islamabad Motorway 2
Installation of permanent steel liners with vibro hammer at Chakri Bridge, Lahore-Islamabad Motorway 3
Construction of 2 meter and 2.2 meter diameter pile upto 60 meter depth. Bridge over River Jehlum at Bhera, Lahore-Islamabad Motorway 2
Construction of 2 meter and 2.2 meter diameter pile upto 60 meter depth. Bridge over River Jehlum at Bhera, Lahore-Islamabad Motorway
Construction of 2.2 Meter Diameter Piles 60 Meters Deep Lahore Islamabad Motorway
Controlled Blasting for Concrete Demolition Tunnel No 3 S band Area Tarbela
Performing Instrumented Static Pile Load Test of 3000 tons at Creek Marina, Karachi
Construction of Pile foundations at Creek Marina, Karachi
Construction of 2 and 2.2 meter diameter piles for bridge over River Jehlum at Bhera, Lahore-Islamabad Motorway
Bhera Motorway 1
Concrete Batching Facility at Bridge over River Jehlum at Bhera, Lahore-Islamabad Motorway
Bridge over River Jehlum at Bhera, Lahore-Islamabad Motorway
Drilling with reverse circulation rotary machine of 2 meter and 2.2 meter diameter pile upto 60 meter depth. Bridge over River Jehlum at Bhera, Lahore-Islamabad Motorway
Construction of 2 meter and 2.2 meter diameter pile upto 60 meter depth. Bridge over River Jehlum at Bhera, Lahore-Islamabad Motorway 3
Lowering of 48 tons steel cage for construction of 2 meter and 2.2 meter diameter pile upto 60 meter depth. Bridge over River Jehlum at Bhera, Lahore-Islamabad Motorway 2
Bhasha Dam Offshore Drilling to Establish Bedrock 1984
Bhasha Dam Offshore Drilling to Establish Bedrock 1984
Drilling operations
Manufacture of Steel reinforcement cages at River Jehlum Bridge, Bhera, Lahore-Islamabad Motorway
Construction of Double Sheet Pile Wall at Mangla Dam 5
Sheet Piling Works at Sukkur Barrage
Geotechnical Investigation Works for bridges in Skardu
Khairpur, Construction of Grain Silos
Preparation of Sheet Piles at Sukkur Barrage
Mineral Exploration Work for US AID, Lakhra
Bhasha Dam Offshore Drilling to Establish Bedrock 1984
Bhasha Dam Offshore Drilling to Establish Bedrock 1984
Offshore Piling at Jinnah barrage
Khairpur Silos Site
Offshore Drilling on Indus river at Bhasha Dam 1984
Mangla Sheetpiling 1993
Mangla Sheetpiling 1993 03
Mangla Sheetpiling 1993
Mangla Sheetpiling 1993
Mangla Dam Hydropower Station
Mangla Dam Hydropower Station
Khairpur Silos Site
Khairpur Silos Site
Bhasha Dam Offshore Drilling to Establish Bedrock 1984
Khairpur Silos Site
Construction of Grain Silos
Khairpur Silos Site
Khairpur Silos Site
Khairpur Silos Site
Lowering of 48 tons steel cage for construction of 2 meter and 2.2 meter diameter pile upto 60 meter depth. Bridge over River Jehlum at Bhera, Lahore-Islamabad Motorway
Khairpur Silos Site
Port-Qasim-2-x-660-MW-Coal-Fired-Power-Plant-drilling-and-dewatering
Port Qasim 2 x 660 MW Coal Fired Power Plant drilling and dewatering
Copyright 2018 IVCC Engineering Lahore | All Rights Reserved | Powered by Nuanced
Email
Page load link
Go to Top
  • ZH