Haveli Bahadur Power Project: 1100-1400 MW RLNG Based Combined Cycle Power PlantĀ (2017)
Piling Work
IVCC constructed 3 Piles of 760 mm diameter with maximum depth of 30.35 meter. Total Drilling footage 80 meters. 3 Pile Load Tests of 750 Tons each were carried out. Pile Load Test Reports of TP 7, TP 7A & TP 8 were also submitted to the client.
Client: Punjab Thermal Power (Pvt) Ltd. (PTPL), Government of Punjab / National Engineering Services (Pvt) Ltd. (NESPAK) Lahore