IVCC CPEC PROJECTS

Projects related to the China–Pakistan Economic Corridor (Chinese: 中国-巴基斯坦经济走廊; Urdu: پاكستان-چین اقتصادی راہداری‬‎; also known by the acronym CPEC). CPEC is the largest bilateral agreement made between China and Pakistan which aims to create an economic corridor that promotes bilateral connectivity with construction, investment as well economic and trade related initiatives between the two nations. IVCC is fully engaged and onboard with several Chinese as well as local partners in this endeavor and has already successfully completed many CPEC related projects while others are in the pipeline.

Exploratory Adits Work Mahl Hydropwer Project in Pakistan under CPEC 2016

2018-10-16T13:57:55+00:00Drilling, Geotechnical Investigations, IVCC CPEC PROJECTS|

Mahl Hydropwer Project in Pakistan: Proposed 590 MW on Jhelum River & Mahl River at the border of AJ&K and Punjab Province: Exploratory Adits Work Scope of Work: Excavation (tunnelling) of Exploratory 1xAdit (Size 2mx2m) for Site Investigation, Location PD3 (Length 34m). Total length of adit 34 meters. Geotechnical Investigation Drilling Footage: 112 Client: Shanghai

Geological Investigation Work Mahl Hydropwer Project in Pakistan under CPEC 2016

2018-10-16T14:01:14+00:00Drilling, Geotechnical Investigations, IVCC CPEC PROJECTS|

Mahl Hydropwer Project in Pakistan: Proposed 590 MW on Jhelum River & Mahl River at the border of AJ&K and Punjab Province: Boreholes Drilling for Geological Investigation Work. Scope of Work: Drilling of 52 Nos. Boreholes Land Drilling (vertical& inclined) upto maximum depth 235 meters (Land & Submerged Drilling). Total drilling carried out 5,098 meters.

Kohala Hydropower Project under CPEC (District Muzaffarabad, Pakistan) 2016

2018-10-16T14:05:54+00:00Drilling, Geotechnical Investigations, IVCC CPEC PROJECTS|

Proposed 1100 MW Hydro Power Project on Jhelum River, Pakistan Boreholes Drilling for Site Investigation Work Scope of Work: Drilling of 4 Nos. Boreholes ZKT-4 (Dia. P/H/N/B), ZKT-5 (Dia.H/N), ZKT-6 (Dia. H/N) and ZKC-15 (Dia. H/N) upto maximum depth 400 meters. Total drilling carried out 1,325 meters. Carried out Rotary Drilling to recover cores from

Azad Pattan Hydropower Project under CPEC (Jehlum River, Pakistan) 2017

2018-11-12T07:41:53+00:00Drilling, Geotechnical Investigations, IVCC CPEC PROJECTS, Recent Projects|

Adits Construction and Borehole Drilling Work in Pakistan. Scope of Work: Drilling of 10 Nos. Boreholes on land and river, 4 Adits and branch Adits. 160 Packer Tests and Installation of piezometers etc. Core Drilling for Investigation in Pakistan on River Jehlum at Azad Pattan Hydro Power Project Geotechnical Investigation Drilling Footage: 394