Exploratory Adits Work Mahl Hydropwer Project in Pakistan under CPEC 2016

2018-10-16T13:57:55+00:00Drilling, Geotechnical Investigations, IVCC CPEC PROJECTS|

Mahl Hydropwer Project in Pakistan: Proposed 590 MW on Jhelum River & Mahl River at the border of AJ&K and Punjab Province: Exploratory Adits Work Scope of Work: Excavation (tunnelling) of Exploratory 1xAdit (Size 2mx2m) for Site Investigation, Location PD3 (Length 34m). Total length of adit 34 meters. Geotechnical Investigation Drilling Footage: 112 Client: Shanghai

Geological Investigation Work Mahl Hydropwer Project in Pakistan under CPEC 2016

2018-10-16T14:01:14+00:00Drilling, Geotechnical Investigations, IVCC CPEC PROJECTS|

Mahl Hydropwer Project in Pakistan: Proposed 590 MW on Jhelum River & Mahl River at the border of AJ&K and Punjab Province: Boreholes Drilling for Geological Investigation Work. Scope of Work: Drilling of 52 Nos. Boreholes Land Drilling (vertical& inclined) upto maximum depth 235 meters (Land & Submerged Drilling). Total drilling carried out 5,098 meters.

Kohala Hydropower Project under CPEC (District Muzaffarabad, Pakistan) 2016

2018-10-16T14:05:54+00:00Drilling, Geotechnical Investigations, IVCC CPEC PROJECTS|

Proposed 1100 MW Hydro Power Project on Jhelum River, Pakistan Boreholes Drilling for Site Investigation Work Scope of Work: Drilling of 4 Nos. Boreholes ZKT-4 (Dia. P/H/N/B), ZKT-5 (Dia.H/N), ZKT-6 (Dia. H/N) and ZKC-15 (Dia. H/N) upto maximum depth 400 meters. Total drilling carried out 1,325 meters. Carried out Rotary Drilling to recover cores from

Azad Pattan Hydropower Project under CPEC (Jehlum River, Pakistan) 2017

2018-11-12T07:41:53+00:00Drilling, Geotechnical Investigations, IVCC CPEC PROJECTS, Recent Projects|

Adits Construction and Borehole Drilling Work in Pakistan. Scope of Work: Drilling of 10 Nos. Boreholes on land and river, 4 Adits and branch Adits. 160 Packer Tests and Installation of piezometers etc. Core Drilling for Investigation in Pakistan on River Jehlum at Azad Pattan Hydro Power Project Geotechnical Investigation Drilling Footage: 394

Port Qasim 2 x 660 MW Coal Fired Power Plant

2018-10-17T09:49:45+00:00Dewatering, Drilling, Recent Projects|

Port Qasim 2 x 660 MW Coal Fired Power Plant – Karachi, Pakistan (2017) IVCC conducted geotechnical investigation works for SEPCO III Electric Power Construction Corporation and Port Qasim Coal Fired Electric Power Co Ltd. A total number if 1316 meters were drilled along with the submission of Geotechnical reports. This work also included drilling

Maple Leaf Cement Factory Geo-technical Investigations

2018-10-17T09:49:13+00:00Geotechnical Investigations, Recent Projects|

Maple Leaf Cement Factory – Iskanderabad, Mianwali District – Pakistan (2017-2018) IVCC Engineering Pvt Ltd executed Geotechnical Investigation works for Maple Leaf Cement plant, one of Pakistan’s largest cement factory. The work was conducted in various phases. A total number of 55 boreholes (max depth 45 meters) were drilled, using rotary drilling equipment. 1,794

Peshawar – Karachi Motorway

2018-10-17T09:41:35+00:00Piling, Recent Projects|

Peshawar – Karachi Motorway (Sukkur – Multan) – (2018) IVCC conducted Piling works, including piling tests, for the construction of 14 bridges. Each of the 416 piles had a diameter of 1.2 meters with a length of 35 – 50 meters. This project was initiated by the National Highway Authority (NHA) Pakistan with China

Cherat Cement Company Ltd.

2018-10-17T09:40:36+00:00Load Testing, Piling, Recent Projects|

Cherat Cement Company Ltd – Nowshera, Khyber Pakhtunkhwa – Pakistan (2018) IVCC constructed a total number of 388 piles and conducted 6 load tests for Cherat Cement in Phase 3 extension of their cement plant. Diameter of piles was 1 – 1.2 meters with a depth of 20-28 meters.